Waste Water Treatment
Integrated Water Services Ltd
Integrated Water Services Ltd were contracted to design, fabricate, build and install a mechanical package at Waste Water Treatment site for a key client within the Water Sector.
The works involved full design of walkways, gantries, platforms, mechanical pipework and associated supports/brackets, and part of the construction was the PST Walkway.
The Primary Sediment Tank (PST) Walkway was manufactured under EN1090-1 EXC2 processes and installed.
All items quality checked throughout each stage of manufacture, including galvanizing with certification and Declaration of Performance being issued upon completion of the project.
Hot Dip Galvanizing has been used for the PST walkway as it is in line with the client specific standards and WIMES (Water Industry Mechanical and Electrical Specifications) requirements.
Photographs ©KyleFallows(Integrated Water Services)
Disclaimer:
Model details provided by Integrated Water Services Ltd as Designer
Photographs taken and provided by Kyle Fallows, Framework Manager for Integrated Water Services Ltd.
Galvanising Details provided by Manchester Galvanizing Ltd.